Learn more about our policy experts.

Media Contacts

Angela Bradbery, Director of Communications
w. (202) 588-7741
c. (202) 503-6768
abradbery@citizen.org, Twitter

Barbara Holzer, Broadcast Manager
w. (202) 588-7716
bholzer@citizen.org

Karilyn Gower, Press Officer
w. (202) 588-7779
kgower@citizen.org

Dan Hockensmith, Communications Officer (Global Trade Watch)
w. (202) 454-5108
dhockensmith@citizen.org

Other Important Links

Press Release Database
Citizen Vox blog
Texas Vox blog
Consumer Law and Policy blog
Energy Vox blog
Eyes on Trade blog
Facebook/publiccitizen

Follow us on Twitter

 

Feb. 9, 2012  

With Japanese Nuclear Crisis Still Unfolding, New Nuclear Reactor Approval Is Move in Wrong Direction

Statement of Allison Fisher, Outreach Director, Public Citizen’s Energy Program

The Nuclear Regulatory Commission’s (NRC) approval today of a proposal for the construction and operation of two new reactors in Georgia is a move in the wrong direction. The license granted to Southern Company is the first in 30 years and comes nearly one year after an earthquake initiated a still-uncontained nuclear crisis in Japan. 

Nuclear development in the U.S. has been dormant for decades for a variety of good reasons, so it is inexplicable that we’ve chosen this moment in history to expand the use of a failed and dangerous technology. 

While countries like Germany, Italy and Switzerland responded to the catastrophe in Japan by announcing plans to eliminate nuclear power from their energy sector, U.S. nuclear regulators are doing the exact opposite. The U.S. is approving new reactors before the full suite of lessons from Japan has been learned and before new safety regulations that were recommended by a task force established after the meltdown crisis at Fukushima have been implemented. 

Even before nuclear reactor vulnerability was exposed in Japan, Southern Company’s proposal to expand its Vogtle nuclear power plant had been delayed by problems with financing and design.

To alleviate the tremendous risk associated with nuclear construction, Southern Company sought a federal loan guarantee, which it received in February 2010 for $8 billion to back the $14 billion project. This incentive, combined with a law passed by Georgia lawmakers in 2009 to allow the company to charge ratepayers up front for costs associated with the project, shields Southern Company from financial risk. In short, if the project fails, both taxpayers and ratepayers will bear the financial losses.

In December, after 18 design revisions, the NRC approved the Westinghouse Electric AP 1000, the reactor design slated for the Vogtle expansion. The new design is untested, and despite its multiple revisions to address safety vulnerabilities, the approval comes before all the lessons learned from Japan have been realized. Incorporating new safety features during the construction would delay the project and increase the cost – the exact circumstances that led to more than 30 mid-construction reactor cancellations in the 1970s.  

The Vogtle nuclear expansion project – initiated by an early site permit application filed six years ago – was supposed to be the poster child for the industry’s much-heralded nuclear renaissance that never materialized. Instead, it has served as a reminder of the reasons reactor construction stopped for 30 years: Nuclear plants are so expensive that corporations cannot afford to build them without a massive infusion of government money, and they raise serious safety questions that remain unaddressed.

###

Public Citizen is a national, nonprofit consumer advocacy organization based in Washington, D.C. For more information, please visit www.citizen.org.

Copyright © 2014 Public Citizen. Some rights reserved. Non-commercial use of text and images in which Public Citizen holds the copyright is permitted, with attribution, under the terms and conditions of a Creative Commons License. This Web site is shared by Public Citizen Inc. and Public Citizen Foundation. Learn More about the distinction between these two components of Public Citizen.


Public Citizen, Inc. and Public Citizen Foundation

 

Together, two separate corporate entities called Public Citizen, Inc. and Public Citizen Foundation, Inc., form Public Citizen. Both entities are part of the same overall organization, and this Web site refers to the two organizations collectively as Public Citizen.

Although the work of the two components overlaps, some activities are done by one component and not the other. The primary distinction is with respect to lobbying activity. Public Citizen, Inc., an IRS § 501(c)(4) entity, lobbies Congress to advance Public Citizen’s mission of protecting public health and safety, advancing government transparency, and urging corporate accountability. Public Citizen Foundation, however, is an IRS § 501(c)(3) organization. Accordingly, its ability to engage in lobbying is limited by federal law, but it may receive donations that are tax-deductible by the contributor. Public Citizen Inc. does most of the lobbying activity discussed on the Public Citizen Web site. Public Citizen Foundation performs most of the litigation and education activities discussed on the Web site.

You may make a contribution to Public Citizen, Inc., Public Citizen Foundation, or both. Contributions to both organizations are used to support our public interest work. However, each Public Citizen component will use only the funds contributed directly to it to carry out the activities it conducts as part of Public Citizen’s mission. Only gifts to the Foundation are tax-deductible. Individuals who want to join Public Citizen should make a contribution to Public Citizen, Inc., which will not be tax deductible.

 

To become a member of Public Citizen, click here.
To become a member and make an additional tax-deductible donation to Public Citizen Foundation, click here.