At What Cost: Why Maryland Can’t Afford A New Reactor


For a PDF version with footnotes, click here.

Escalating cost estimates, regulatory uncertainty, a shaky corporate structure and equally shaky national economic climate are issues that need to be confronted as Maryland faces a proposal for a new nuclear reactor.

A Risky Trend: Prohibitive and Uncertain Cost


The current cost trend for building a new nuclear reactor in the U.S. after 30 years of development dormancy is one of a line moving straight up. Industry cost estimates for new reactors have tripled in just the past four years—from $1,500 - $2,000/kw to $4,500 - $6,000+/kw. Some independent estimates from Wall Street firms like Standard & Poor’s and Moody’s now predict costs of $7,000/kw and above.

Proposed by UniStar Nuclear (a partnership between Electricite de France, EdF, and Constellation Energy Group, CEG), Calvert Cliffs-3 is no exception to these extraordinary cost estimates.

Constellation sought a $2 Billion loan guarantee from the state to cover the full cost of a new reactor. Constellation also erroneously projected that private capital could be raised to finance the plant. As reported by the Maryland Gazette, “Though the new $2 billion reactor would be built by private funds, Nustart [a previous Constellation nuclear consortium] is asking Maryland to guarantee the necessary loans if Calvert Cliff is selected.”

2007 - Early reports on the proposed new reactor for southern Maryland quoted a $5 billion price tag for a new 1,600 Mw, US Evolutionary Power Reactor.

2008 - Since those early quotes, UniStar has been reluctant to provide any public cost estimates for construction of the proposed Calvert Cliffs-3 reactor, but in August 2008 hearings before the Maryland Public Service Commission, CEO George Vanderheyden acknowledged that the company’s estimates are on the “upper end” of the $4,500 - $6,000/kw level. For a 1600 MW reactor like Calvert Cliffs-3 (CC3), that would mean construction costs of about $9.6 Billion.

2008 - Moreover, according to expert witness David Schlissel, in testimony before the Maryland Public Service Commission, “the 1600 MW Calvert Cliffs 3 could be expected to cost in the range of $7 billion to $9 billion, without any financing costs. Including financing costs could be expected to increase these estimated costs by several billion dollars.”

2009 - EPRs are currently under construction in Finland and France. Both projects have been plagued with delays and cost overruns. The Finnish project is three years behind schedule with a $2.2 billion increase from its original $4.5 billion estimated cost.

Cost overruns were part of the utility landscape in the 1970s and 1980s, and played a major role in the wave of nuclear reactor cancellations in that period, and the subsequent unwillingness of private investment firms to fund new reactor construction. A Department of Energy study of 75 reactors of the first atomic age found an average cost overrun of 207%.

Shaky Financial Record: Bankruptcy and Plummeting Stock


September, 2008 - Constellation Energy faced near bankruptcy as its share value dropped 58% over a three day period. The implosion, set off primarily by the failure of Lehmann Brothers and Constellation Energy’s energy trading division, resulted in an initial bailout deal orchestrated by Warren Buffett’s MidAmerican Energy Holding Co. The acquisition valued Constellation at $4.7 billion.

March, 2008 - EdF's shares have dropped by over 40% during the last six months alone. The EdF share now stands 12% below the value when it was first introduced to the stock market in November 2005.

Preemptive Taxpayer Bailout and Limited Liability


UniStar Nuclear currently owns nothing, and has little capital: perhaps $700 million total—not nearly enough to finance a potentially $10 Billion project. Indeed, the Calvert Cliffs-3 reactor alone would cost more than twice the entire value of Constellation Energy Group. But UniStar’s business model doesn’t require it to have money or take financial risk—instead it wants the taxpayers to provide the money and take the risk.

At Constellation’s 2008 annual shareholders meeting, Mayo Shattuck explained that the company’s commitment to move forward on the new reactor was predicated on “receiving timely and workable loan guarantees…” These federal loan guarantees allow borrowers to receive a loan with the federal government assuming the risk.

According to the U.S. House of Representatives Rules Committee, a loan guarantee is a “commitment by the federal government to pay part or all of a loan’s principal and interest to a lender…in case the borrower defaults.” Not only does the government guarantee the loans, but the loans can come from only one source, the Federal Financing Bank, whose source of funds is the U.S. Treasury. Thus, taxpayers will be lending the money for the project, and then guaranteeing the loans to themselves!

Both the Congressional Budget Office and the Government Accountability Office consider the risk of default on nuclear loan guarantees to be very high—well above 50%.

While Constellation and EdF are seeking to transfer the risk of financing nuclear reactors to taxpayers, they have taken extra steps to further insulate themselves from any financial liability in the event the project fails. The loans would flow into the Calvert Cliffs 3 Nuclear Project LLC, a company with basically no assets. As a Limited Liability Corporation, if CC3NP defaulted on these loans, the assets of the parent company, UniStar, wouldn’t be touched. But UniStar’s “innovative business model” provides more layers of protection for its parent companies. There are no fewer than seven Limited Liability Corporations between the proposed Calvert Cliffs-3 reactor and the parent companies of EdF and CEG. UniStar itself is a Limited Liability Corporation. If the Calvert Cliffs-3 project fails, the assets of UniStar’s parents, Constellation Energy and Electricite de France, likely would be protected—it’s the taxpayers who would end up holding the bag.

Regulatory Uncertainty: Foreign Ownership


The Atomic Energy Act prohibits “foreign ownership, control or domination” of any U.S. reactor.

In this case, not only does EdF own 50% of UniStar, already stretching that definition, but it also owns 9.5% of Constellation—the other half-owner of UniStar. Plus, EdF recently bailed out Constellation (see below) with a $4.5 billion investment in CEG’s five existing nuclear reactors and a $2 billion option for its non-nuclear generating capacity. This would represent a larger investment in CEG than the company is valued.

Moreover, the reactor itself would be provided by another French firm, Areva. Both Areva and EdF are owned by the French government.

And UniStar acknowledged in proceedings before the Maryland Public Service Commission that in addition to expecting U.S. taxpayer loan guarantees to cover 80% of the costs, it will be asking the French taxpayers, through their Export-Import Bank, to cover the other 20%.

Taken together, this corporate structure and financing appears to violate the Atomic Energy Act. In March 2009, an Atomic Safety and Licensing Board (ASLB) ordered judicial hearings on this issue. Should the ASLB find the project in violation, a license to build the reactor could not be granted.

Opportunity Cost: Renewable Energy and Energy Efficiency


Former Nuclear Regulatory Commission Commissioner and utility expert Peter Bradford has noted that the “all of the above” approach—often advocated by the nuclear industry—to our national energy portfolio does not necessarily play out well at the local level. According to Bradford, “sometimes solutions [to energy demand] drive out other solutions. If a region commits to a 1,600 MW reactor, than there is little motivation to do efficiency or renewables.”

Meanwhile, EdF recently told the British government that its policy of promoting wind energy threatened EdF’s intent of building more reactors there—a potential harbinger for its approach in Maryland.

Tightening the Grip: Why EdF Wouldn’t Back Down


When Warren Buffett stepped in to bail out CEG in October 2008, many analysts believed it was a done deal. EdF made an initial counteroffer, but was rebuked. But the determined French-state controlled nuclear developer made a successful 11th hour deal to whisk Constellation away from Warren Buffett.

EdF’s determination is based on protecting its market to build French reactors in the U.S. “These are very long-term projects. We felt maybe this could have been threatened in a different setting,” with MidAmerican as the owner of Constellation, Chief Financial Officer Daniel Camus said in an interview with Bloomberg News Service.

The Financial Times reported in December that “The French group’s offer is clearly aimed at scuppering the $4.7bn bid made by Mr. Buffett’s MidAmerican Energy in September, which it fears could threaten Constellation’s future nuclear investment capacity."


 

Copyright © 2014 Public Citizen. Some rights reserved. Non-commercial use of text and images in which Public Citizen holds the copyright is permitted, with attribution, under the terms and conditions of a Creative Commons License. This Web site is shared by Public Citizen Inc. and Public Citizen Foundation. Learn More about the distinction between these two components of Public Citizen.


Public Citizen, Inc. and Public Citizen Foundation

 

Together, two separate corporate entities called Public Citizen, Inc. and Public Citizen Foundation, Inc., form Public Citizen. Both entities are part of the same overall organization, and this Web site refers to the two organizations collectively as Public Citizen.

Although the work of the two components overlaps, some activities are done by one component and not the other. The primary distinction is with respect to lobbying activity. Public Citizen, Inc., an IRS § 501(c)(4) entity, lobbies Congress to advance Public Citizen’s mission of protecting public health and safety, advancing government transparency, and urging corporate accountability. Public Citizen Foundation, however, is an IRS § 501(c)(3) organization. Accordingly, its ability to engage in lobbying is limited by federal law, but it may receive donations that are tax-deductible by the contributor. Public Citizen Inc. does most of the lobbying activity discussed on the Public Citizen Web site. Public Citizen Foundation performs most of the litigation and education activities discussed on the Web site.

You may make a contribution to Public Citizen, Inc., Public Citizen Foundation, or both. Contributions to both organizations are used to support our public interest work. However, each Public Citizen component will use only the funds contributed directly to it to carry out the activities it conducts as part of Public Citizen’s mission. Only gifts to the Foundation are tax-deductible. Individuals who want to join Public Citizen should make a contribution to Public Citizen, Inc., which will not be tax deductible.

 

To become a member of Public Citizen, click here.
To become a member and make an additional tax-deductible donation to Public Citizen Foundation, click here.